Home → Blog → Remodeling an Older Home: What to Know Before You Start
Updated October 29, 2026
Remodeling an older home? See what to check first, from lead and asbestos to wiring and layout, plus how to plan for surprises.
Marc Santarromana
In this article
Quick answers What makes an older home different to remodel? What should you check before you design? What do older Chicago-area homes look like? What about the layout? Can you keep original details? How do you plan for surprises? How long does it take? What does it cost? Should you remodel or move? Remodeling an older home questions Planning a remodel in an older home?Remodeling an older home is rewarding, and it asks for a different kind of planning. Older houses often have better bones and more character than newer ones. They also hide things: wiring, plumbing, and materials that were normal when the house was built and need a closer look today. Here’s what to check, what to expect, and how to plan so the surprises stay small.
Is it worth remodeling an older home? Often, yes, if the house suits you and the structure is sound.
What changes with age? What’s behind the walls, what materials may need testing, and sometimes the layout.
What should you do first? Look at the house with a designer before you finalize a plan.
How do you plan for the unknown? Keep a cushion and ask for an itemized estimate.
Remodeling opens up the walls, and in an older house that can reveal aging wiring, plumbing, sagging floors, and framing that’s out of square. Whatever you build has to fit that frame. The room you’re planning may look the same as one in a newer house, but getting it to sit properly can take extra work.
Start with these.
Lead paint. The EPA says its Renovation, Repair and Painting rule covers homes built before 1978, and that anyone paid to disturb painted surfaces in those homes must be certified and use lead-safe work practices. Ask any contractor to show their certification.
Asbestos. The EPA says asbestos is most often found in homes built before the 1970s, that you can’t tell by looking, and that testing by an accredited professional is how you know. Asbestos in good condition that’s left alone is unlikely to be a health risk. The concern is when materials are damaged or disturbed during remodeling, so test suspect materials before work begins.
Wiring and plumbing. Older systems weren’t built for a modern kitchen with several large appliances. Ask your team what needs to be updated for the room you’re planning.
Moisture. Damp basements, old windows, and worn roofing can cause problems that are cheaper to fix before finishes go in. Our guide to which rooms to remodel first suggests handling moisture before cosmetic work.
Your home’s status. Find out whether your house sits in a historic district or is a landmark before you draw anything. In Evanston, the City lists five National Register districts, four local districts, and over 850 individual landmarks.
It varies by town and by decade. Chicago has a lot of one kind of older house. The Chicago Architecture Center counts more than 80,000 bungalows, roughly a third of the city’s single-family homes, built of brick with one and a half stories over a basement. A team that knows the type has a head start. Even so, only a close look tells you what’s inside yours.
Many older homes have smaller, closed-off rooms. Opening a wall can change how the whole floor works, but it isn’t always simple, and it isn’t always necessary. Our open versus closed kitchen guide helps you decide, and our guide to kitchen layout types shows what each shape needs.
Often, yes. Trim, doors, and built-ins can be preserved or matched. Custom cabinets can help new work blend with old. Our AnnTucker Cabinetry shop in Itasca builds custom cabinets, so your designer can plan for odd sizes and match details with the people making them.
Some things stay hidden until the walls open, so plan for that. A reserve of 10 to 15 percent, kept apart from your main budget, is common. Ask your contractor how a hidden problem would be found, priced, and approved. And get a designer into the house before the plan is locked.
Older homes can add time when something unexpected turns up. As rough guides from our projects, a kitchen runs about 8 to 12 weeks, a primary bathroom about 8 to 12, and a guest bathroom about 4 to 6. Our bathroom remodel timeline guide explains the stages. Your project manager confirms the schedule once the design is final.
No one number fits every house. The age of the home and the state of the framing and systems both move the price, and your itemized estimate comes once the design is final. Our kitchen remodel cost guide and bathroom remodel cost guide explain what moves the numbers.
If the house fits your life and the neighborhood suits you, remodeling is often the better fit. If it needs more than you want to take on, moving may be worth considering. Our remodel or move guide can help you weigh it.
It depends on the house and your goals.
Some of it, not all.
EPA recommends testing suspect materials before work that would disturb them.
No, but ask what changing it involves.
Tell us about your house, and we’ll show you what to check first.
Tell us what you’d like to change, and we’ll help you decide where to begin.